Loading
Preparing live trade intelligence...
Loading
Preparing live trade intelligence...
Loading
Loading search results...
Real-time customs records from 4 countries
Uzbekistan's imports of bevelled reveal evolving trade dynamics, including sourcing patterns, demand shifts, and supplier relationships. Leveraging shipment-level customs data, the insights remain both accurate and up to date.
From 01 Jun 2024 to 31 May 2025, the country recorded 14 shipments, supported by active importers and overseas suppliers.
Imports were largely driven by suppliers from Italy, China, and Turkey, pointing to strong trade ties and expanding sourcing strategies.
Total Shipments
14
↑ +8.3% vs last periodTotal Value (USD)
$268.6K
↑ +12.1% vs last period10 shipments shown
| Date | HS Code | Product | Destination | Qty | Value | Importer | Exporter | Actions |
|---|---|---|---|---|---|---|---|---|
| May 23, 2025 | 6907401000 | 1. Anti-slip Tile For Safety Step, (12.5x25 Cm) Cobalt Blue, Product Code 21271 Petit Carr... | UZBEKISTAN | $4,219 | ||||
| Apr 30, 2025 | 6907211000 | 1. Anti-slip Tile For Safety Step, (12.5x25 Cm) Cobalt Blue, Product Code 21271 Petit Carr... | UZBEKISTAN | 13.13square meter | ||||
| Apr 8, 2025 | 4418750000 | 1. Samples Of Engineered And Parquet Boards, Both Joined Into Panels Of Several Planks And... | UZBEKISTAN | |||||
| Apr 8, 2025 | 4418750000 | 1. Samples Of Engineered And Parquet Boards, Both Joined Into Panels Of Several Planks And... | UZBEKISTAN | $70 | ||||
| Apr 8, 2025 | 4418750000 | 1. Samples Of Engineered And Parquet Boards Are Stacked In Packs, Cut Into Small Pieces Fo... | UZBEKISTAN | 0.756square meter | ||||
| Apr 8, 2025 | 4418750000 | 1. Samples Of Engineered And Parquet Boards Are Stacked In Packs, Cut Into Small Pieces Fo... | UZBEKISTAN | |||||
| Jan 29, 2025 | 8205200000 | 1. Art. 7710632 Stone Hammer, 24 Oz., All-forged, Two-component Bevelled Handle. Instrumen... | UZBEKISTAN | $337 | ||||
| Dec 13, 2024 | 8537209800 | Air-insulated Switchgear 220 Kv (part Of The Set) Disassembled, Consists Of: 1) Pipe Seaml... | UZBEKISTAN | |||||
| Dec 12, 2024 | 8537209800 | Air-insulated Switchgear 220 Kv (part Of The Kit) Disassembled, Consists Of: 1) Pipe Seaml... | UZBEKISTAN | |||||
| Nov 30, 2024 | 8502398000 | Gas-piston Engine And Auxiliary Equipment, Additional Spare Parts (chast Completa) In Disa... | UZBEKISTAN | $28,996 |
Get deeper insights with advanced filters, company profiles, and data exports.
See how our platform transforms your trade intelligence operations with a live walkthrough.
Book a DemoDownload a free sample dataset and explore the full depth of our global trade data.